联系我们

申请软件试用或演示

注册获取免费试用许可证或演示
申请软件试用

Analysing the Impact of Footbridge on GSM-R coverage

Customer: Undisclosed
Location: NSW, Australia

Challenges:

Understanding the impact of a proposed footbridge on a GSM-R network is essential to railway communications, allowing the network operator to identify potential risks and mitigation solutions before the development starts.

Approach:

Using HTZ Communications, ATDI completed a coverage degradation analysis for a network operator in NSW, Australia.

Solution:

The figure below shows the signal reception levels along the track in dBm. The colour code identifies restrictions to signals from a given distance, with the area in green receiving no coverage.

The impact is further evidenced below, which shows the capture of the signal level before and after the introduction of the bridge. These images show the simulation of the new footbridge with the blue identifying the signal level before and the red after.

Conclusion:

Ensuring new structures do not encroach on communications networks is essential to train operators from a health and safety perspective and ensuring that safety-critical networks are resilient and not impacted by interference.

For full information on HTZ, please contact your local office.


ATDI 中国
11 boulevard Malesherbes
75008 Paris, France
+33 1 53 30 81 41
+33 1 53 30 81 49
china@atdi-group.com

扫描二维码前往官方微信公众号

Copyright © 2024 版权所有 隐私条款条款与条件
网站设计 Underlined
magnifiercross